Projects finished

WE COLLABORATE WITH ARCHITECTS
FROM ALL OF MEXICO.

2014 | Chihuahua

Faculty of Chemistry UACH

Institutional building with +1,100 m2 of insulated tempered glass and 9mm clear tempered glass railings, with +2,800 m2 of 4mm aluminum composite panel.

2014 | Chihuahua
Faculty of Chemistry UACH
2015 | Chihuahua

Superior Court of the State of Chihuahua

Office complex with +11,500 m2 of insulated tempered glass, 12mm railings, façade with a 30 m high Spider System, + 700m2 panels based on wood-finished aluminum staves.

2015 | Chihuahua
Superior Court of the State of Chihuahua
2017 | Chihuahua

Interceramic Corporate

Office building with +1,500 m2 of 9mm Filtrasol tempered glass with a 22mm rib and cable structuring system; interiors with +1,000 m2 of 9mm clear tempered glass.

2017 | Chihuahua
Interceramic Corporate
2017 | Estado de México

ID Vertical Satelite

2 apartment towers of 13 levels each, with Eurovent Premium Cuprum aluminum profiles +4,500 m2 of 6 and 9mm clear tempered glass.

2017 | Estado de México
ID Vertical Satelite
2018 | Chihuahua

Metroloft

12-level apartment tower, with +3,000 m2 of Filtrasol insulated tempered glass, 6mm Clear, 19mm tempered glass railings, 9mm tempered glass bathroom doors.

2018 | Chihuahua
Metroloft
2019 | Chihuahua

Prisma

Office building with + 1,400 m2 of Curtain Wall System with Cuprum MC-450 aluminum profiles, with Reflecta Azul, Reflecta Oro, Solarblue and Filtrasol insulated tempered glass; + 800m2 of 4mm aluminum composite panel.

2019 | Chihuahua
Prisma
2019 | Chihuahua

Alsuper Corporate

Office building with +2,500 m2 of Solarban 60 insulated tempered glass-based Curtain Wall System on Vitro's Solexia with Cuprum MC-450 aluminum profiles; +1,200 m2 of 9mm clear tempered glass.

2019 | Chihuahua
Alsuper Corporate
2019 | Chihuahua

Altozano

3500 m2 clubhouse made with insulated glass doors SKN-176 from SAINT-GOBAIN and MC-450 structural system from CUPRUM.

2019 | Chihuahua
Altozano
2019 | Chihuahua

Marriot

Hotel with more than 850 m2 of insulated glass and 2500m2 of aluminum panel.

2019 | Chihuahua
Marriot
2020 | Chihuahua

All Loft

14-level apartment tower with +3,500 m2 of Filtrasol + Clear, Clear + Clear insulated tempered glass, 19mm tempered glass railings, 9mm tempered glass bathroom doors.

2020 | Chihuahua
All Loft
2021 | Coahuila

Edden III

Office Building with +3,200 m2 of Saint Gobain KNT 140 insulated tempered glass and 9mm clear tempered glass, with Cuprum MC-450 aluminum profile curtain wall system, with +700 m2 of 4mm aluminum composite panel.

2021 | Coahuila
Edden III
2021 | Nuevo León

Gilsa Cumbres

Corporate building with +1,800 m2 of Starphire + Claro insulated tempered glass, with MC-450 aluminum profiles in Champagne finish, with +1,250 m2 of 4mm aluminum composite panel.

2021 | Nuevo León
Gilsa Cumbres
2021 | Guanajuato

All Haus León Torre A

15-level apartment tower with curtain wall system with MC-450 aluminum profiles from Cuprum and Evo 67 glass from Saint Gobain; with +950 m2 of 4mm aluminum composite panel.

2021 | Guanajuato
All Haus León Torre A
2021 | Chihuahua

Hotel Four Points by Sherato

10-level hotel with +1,900 m2 of clear Filtrasol insulated tempered glass and 9mm clear tempered glass on handrails and bathroom doors; + 800 m2 of 4mm aluminum composite panel.

2021 | Chihuahua
Hotel Four Points by Sherato
2021 | Chihuahua

Southpark

Two industrial buildings with 1000 m2 of 9mm tempered FILTRASOL glass and MC-450-AD structural system and 1400 m2 of aluminum panel.

2021 | Chihuahua
Southpark